Pump inspection & FAT witnessing — API 676 / API 682

Independent inspection of positive displacement pumps, centrifugal pumps and mechanical seals at the manufacturer, from material review to the release note.

What we check

  • Material certificates (EN 10204 3.1 / 3.2) against the datasheet and heat numbers
  • Hydrostatic test of pressure-containing parts: pressure, hold time, gauge calibration
  • Mechanical run and performance tests: flow, head, vibration, bearing temperature, noise
  • Mechanical seal and seal support system per API 682: arrangement, plan, leak check
  • Final visual, dimensional, nameplate, painting and preservation

Codes and references

API 676 (positive displacement pumps — rotary), API 682 (shaft sealing systems), the project specification and the approved ITP. Every reading is reported against its acceptance criterion.

Recent example

Hail & Ghasha Offshore (ADNOC): hydrostatic test of PCM sludge pumps per API 676, on behalf of Fulkrum for Saipem.

Deliverables

  • Flash report on the evening of the test
  • Full inspection report within 24 h (working days), in your template
  • Inspection Release Note once all points are closed

Frequently asked questions

Can you witness a pump FAT at short notice?

Send the test notification and ITP: availability is confirmed within 24 h (working days).

Do you review the test procedure before the FAT?

Yes. Procedure revision, acceptance criteria and instrument calibration are checked before the test starts.

Need this on your next order?

Send the PO scope, ITP and vendor location. Reply within 24 h (working days).